Electrical Installation ยท

Upgrading Your Electricity Connection (Verzwaren) โ€“ Single-Phase to Three-Phase in Belgium

Need more power for a heat pump, EV charger, induction hob or home battery? We calculate the capacity you need, guide your upgrade request with Fluvius or Sibelga, adapt your installation and arrange the AREI inspection.

Pricing

From โ‚ฌ350 to โ‚ฌ2,500

Indicative price range. Final quote depends on the projector model, gobo design, and installation conditions.

When Do You Need a Connection Upgrade?

Many Belgian homes still have a single-phase 40 A connection or a limited main fuse. That is no longer enough once you heat, drive or cook electrically. Typical signs:

  • You are installing a heat pump
  • You are adding an EV charger
  • You are switching to induction cooking
  • You are adding a home battery or a larger solar system
  • Your main switch or RCD trips regularly
  • You are renovating or extending your home

๐Ÿ‘‰ An upgrade is not always necessary. Sometimes smart load management is enough. We first calculate what you really need.


What Does Upgrading (Verzwaren) Mean?

During an upgrade, the grid operator increases the available capacity of your connection. There are two options:

  • Higher current โ€” for example from 40 A to 50 A or 63 A single-phase
  • From single-phase to three-phase โ€” for example 3 ร— 400 V + N, for heavier appliances and three-phase EV chargers or heat pumps
ConnectionTypically suitable for
Single-phase 40 AStandard home without heavy loads
Single-phase 63 AHome with induction and a small EV charger
Three-phase (3 ร— 400 V + N)Heat pump, fast EV charger, large solar system

In Brussels and some older areas, the grid is still 3 ร— 230 V (without neutral). This affects the choice of EV charger, heat pump and inverter โ€” we take it into account.


Fluvius, Sibelga or ORES?

The upgrade itself is carried out by your distribution grid operator:

  • Fluvius โ€” Flanders
  • Sibelga โ€” Brussels-Capital Region
  • ORES / RESA โ€” Wallonia

The grid operator adapts the connection and the meter and charges its own fee. Your own installation behind the meter, however, must be ready and inspected โ€” and that's where we come in.


What We Do for You

1. Power calculation & advice

  • Inventory of your current and future loads
  • Calculation of the required connection capacity
  • Advice: upgrade or load management (EV charger with dynamic control)
  • Taking the Flemish capacity tariff into account

2. Request to the grid operator

  • Help with the request to Fluvius, Sibelga or ORES
  • Providing technical data and diagrams
  • Coordinating the planning of the works

3. Adapting your electrical installation

  • New or modified fuse box / distribution board
  • Replacement of the main switch and main RCD
  • New supply cable from meter to distribution board if needed
  • Conversion from single-phase to three-phase distribution
  • Dedicated circuits for heat pump, EV charger and cooktop
  • Checking and improving the earthing

4. AREI inspection & diagrams

  • Single-line and location diagrams
  • Guidance through the AREI conformity inspection by an accredited body
  • Resolving any remarks

Step by Step

  1. Site visit โ€” check of meter, fuse box, cables and earthing
  2. Advice & quote โ€” required capacity and necessary adjustments
  3. Request to the grid operator
  4. Adapting your installation โ€” before or together with the grid operator's works
  5. Grid operator works โ€” connection and meter are upgraded
  6. Inspection & handover โ€” a safe, inspected installation ready for your new appliances

๐Ÿ‘‰ We are happy to combine the upgrade with the installation of your EV charger, heat pump connection or home battery, so everything is right in one go.


Frequently Asked Questions

How do I know which connection I have now?

The details are on your meter and your energy bill. During a site visit we check the main fuse, the meter and the cabling.

Is an upgrade required for an EV charger or heat pump?

Not always. With dynamic load management, an EV charger can adapt to the available capacity. With a heat pump, fast charger and induction combined, an upgrade is often needed.

How long does an upgrade take?

It depends on the grid operator's planning and the required works. We make sure your installation is ready on time, so there is no delay on your side.

Is a new inspection needed?

When the installation is modified, a new AREI inspection is usually required. We prepare the installation and diagrams and guide you through the inspection.

How much does an upgrade cost?

The grid operator charges its own fee for the connection and meter. In addition, there are the costs of adapting your installation, which depend on the condition of your fuse box and cabling.


Service Pricing

  • Site visit & power advice โ€” from โ‚ฌ95
  • Replacement of main switch & RCD โ€” from โ‚ฌ350
  • New three-phase fuse box โ€” โ‚ฌ900โ€“โ‚ฌ2,500

Get Advice on Your Connection Upgrade

Not sure whether your connection is enough for a heat pump, EV charger or induction? We visit, calculate what you need and handle the whole process.